wpeBD.jpg (31066 bytes)

RADIANT HEATED FLOORS
First we put in 4x4 fencing wire over small raised lifts so the cement can get under the pipes. We tied the 3/4" heavy duty 200Psi plastic pipe (from Lowe's - 500 feet - $88) to the wire in bends going back and forth coming out to the future water heater location on the right.

wpeBC.jpg (28248 bytes)

 

wpeAF.jpg (47743 bytes)

 


(Our Fascinating information HOME page)

COMMENTS AND FEEDBACK)